{"id":121044,"date":"2023-10-06T12:01:05","date_gmt":"2023-10-06T17:01:05","guid":{"rendered":"https:\/\/www.panamaequity.com\/listings\/generation-tower-pre-venta-de-apartamentos-con-licencia-condo-hotel-en-costa-del-este\/"},"modified":"2026-02-02T11:29:08","modified_gmt":"2026-02-02T16:29:08","slug":"generation-tower-pre-venta-de-apartamentos-con-licencia-condo-hotel-en-costa-del-este","status":"publish","type":"property","link":"https:\/\/www.panamaequity.com\/es\/listings\/generation-tower-pre-venta-de-apartamentos-con-licencia-condo-hotel-en-costa-del-este\/","title":{"rendered":"Preventa de Condos en Generation Tower, Costa del Este"},"content":{"rendered":"<p>Te presentamos Generation Tower, un proyecto en preventa ubicado en Costa del Este, oficialmente licenciado para alquileres a corto plazo, incluyendo plataformas como Airbnb. Es una excelente opci\u00f3n para quienes buscan apartamentos de una rec\u00e1mara que pueden ser administrados profesionalmente, ya sea para uso personal o para generar ingresos por alquiler.<\/p>\n<h2><strong>Generation Tower<\/strong><\/h2>\n<div class=\"flex max-w-full flex-col grow\">\n<div class=\"min-h-8 text-message relative flex w-full flex-col items-end gap-2 text-start break-words whitespace-normal [.text-message+&amp;]:mt-5\" dir=\"auto\" data-message-author-role=\"assistant\" data-message-id=\"8090e6e9-deba-4f74-ab84-2e6944e91655\" data-message-model-slug=\"gpt-4o\">\n<div class=\"flex w-full flex-col gap-1 empty:hidden first:pt-[3px]\">\n<div class=\"markdown prose dark:prose-invert w-full break-words light\">\n<p data-start=\"0\" data-end=\"288\">Generation Tower ofrece una amplia variedad de opciones gastron\u00f3micas, un bar en la azotea y espacios de coworking de \u00faltima generaci\u00f3n dise\u00f1ados para fomentar la creatividad y la productividad. Adem\u00e1s, los residentes pueden disfrutar de un gimnasio de primer nivel y relajarse en el spa.<\/p>\n<p data-start=\"290\" data-end=\"378\">El edificio se eleva a 42 pisos de altura, con unidades que van desde 53\u202fm\u00b2 hasta 65\u202fm\u00b2.<\/p>\n<p data-start=\"380\" data-end=\"406\">Otras amenidades incluyen:<\/p>\n<ul data-start=\"408\" data-end=\"614\" data-is-last-node=\"\" data-is-only-node=\"\">\n<li data-start=\"408\" data-end=\"475\">\n<p data-start=\"410\" data-end=\"475\">3 niveles de espacio comercial para tiendas, restaurantes y m\u00e1s<\/p>\n<\/li>\n<li data-start=\"476\" data-end=\"501\">\n<p data-start=\"478\" data-end=\"501\">Piscina tipo infinity<\/p>\n<\/li>\n<li data-start=\"502\" data-end=\"523\">\n<p data-start=\"504\" data-end=\"523\">Pista para correr<\/p>\n<\/li>\n<li data-start=\"524\" data-end=\"549\">\n<p data-start=\"526\" data-end=\"549\">Espacios de coworking<\/p>\n<\/li>\n<li data-start=\"550\" data-end=\"562\">\n<p data-start=\"552\" data-end=\"562\">Sky Pool<\/p>\n<\/li>\n<li data-start=\"563\" data-end=\"574\">\n<p data-start=\"565\" data-end=\"574\">Sky Bar<\/p>\n<\/li>\n<li data-start=\"575\" data-end=\"592\">\n<p data-start=\"577\" data-end=\"592\">Club atl\u00e9tico<\/p>\n<\/li>\n<li data-start=\"593\" data-end=\"614\" data-is-last-node=\"\">\n<p data-start=\"595\" data-end=\"614\" data-is-last-node=\"\">Centro de bienestar<\/p>\n<\/li>\n<\/ul>\n<h2><strong>Costa del Este<\/strong><\/h2>\n<p data-start=\"0\" data-end=\"512\"><a href=\"https:\/\/www.panamaequity.com\/buildings-in-panama\/costa-del-este\/\">Costa del Este<\/a>, uno de los vecindarios m\u00e1s cotizados de la <a href=\"https:\/\/www.panamaequity.com\/buildings-in-panama\/panama-city-panama\/\">Ciudad de Panam\u00e1<\/a>, ofrece un ambiente \u00fanico de ciudad dentro de la ciudad. A solo 5 kil\u00f3metros del centro, cuenta con m\u00faltiples amenidades que lo convierten en una comunidad autosuficiente con un aire al estilo de Los \u00c1ngeles. Sus amplias avenidas bordeadas de palmeras, autos de lujo, rascacielos modernos, comunidades cerradas y cercan\u00eda a oficinas corporativas y colegios de prestigio hacen de Costa del Este una mezcla ideal de elegancia y tranquilidad.<\/p>\n<p data-start=\"514\" data-end=\"581\"><a href=\"https:\/\/www.panamaequity.com\/es\/propiedad-ciudad-es\/costa-del-este-es\/\">Descubre las propiedades que tenemos disponibles en Costa del Este<\/a>.<\/p>\n<p data-start=\"583\" data-end=\"617\" data-is-last-node=\"\" data-is-only-node=\"\">\u00a1<a href=\"https:\/\/www.panamaequity.com\/contact-us\/\">Cont\u00e1ctanos para m\u00e1s informaci\u00f3n<\/a>!<\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"flex min-h-[46px] justify-start\"><\/div>\n<div class=\"mt-3 w-full empty:hidden\">\n<div class=\"text-center\">\n<div>\n<div class=\"inline-flex border border-gray-100 dark:border-gray-700 rounded-xl\">\n<div class=\"text-token-text-secondary flex items-center justify-center gap-4 px-4 py-2.5 text-sm whitespace-nowrap\"><\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Te presentamos Generation Tower, un proyecto en preventa ubicado en Costa del Este, oficialmente licenciado para alquileres a corto plazo, incluyendo plataformas como Airbnb. Es una excelente opci\u00f3n para quienes buscan apartamentos de una rec\u00e1mara que pueden ser administrados profesionalmente, ya sea para uso personal o para generar ingresos por alquiler. Generation Tower Generation Tower&#8230;<\/p>\n","protected":false},"author":23323,"featured_media":120821,"parent":0,"menu_order":0,"comment_status":"open","ping_status":"closed","template":"","property-feature":[],"property-type":[649,324,652],"property-city":[407,428],"property-status":[325],"class_list":["post-121044","property","type-property","status-publish","has-post-thumbnail","hentry","property-type-apartamentos","property-type-ciudad","property-type-pre-construccion","property-city-costa-del-este-es","property-city-cuidad-panama-es","property-status-comprar-es"],"property_meta":{"REAL_HOMES_property_price":"280200","REAL_HOMES_property_old_price":"","REAL_HOMES_property_price_prefix":"","REAL_HOMES_property_price_postfix":"","REAL_HOMES_property_size":"58","REAL_HOMES_property_size_postfix":"m2","REAL_HOMES_property_lot_size":"","REAL_HOMES_property_lot_size_postfix":"","REAL_HOMES_property_bedrooms":"1","REAL_HOMES_property_bathrooms":"1","REAL_HOMES_property_garage":"","REAL_HOMES_property_id":"","REAL_HOMES_property_year_built":"Q4 2027","rvr_property_owner":"","REAL_HOMES_featured":"1","REAL_HOMES_additional_details_list":[],"REAL_HOMES_property_location":{"latitude":"9.01170043103","longitude":"-79.4644062114","zoom":"0"},"REAL_HOMES_property_address":"Avenida Costa Del Mar, Costa del Este, Juan D\u00edaz, Distrito Panam\u00e1, Panam\u00e1","REAL_HOMES_property_map":"0","REAL_HOMES_property_images":[{"width":150,"height":150,"file":"2023\/10\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-1.jpg","filesize":141282,"sizes":{"thumbnail":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-1-150x150.jpg","width":150,"height":150,"mime-type":"image\/jpeg","filesize":27605,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20210007\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-1-150x150.jpg"},"medium":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-1-300x169.jpg","width":300,"height":169,"mime-type":"image\/jpeg","filesize":59030,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20210007\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-1-300x169.jpg"},"medium_large":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-1-768x432.jpg","width":768,"height":432,"mime-type":"image\/jpeg","filesize":297488,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20210007\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-1-768x432.jpg"},"large":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-1-1024x576.jpg","width":1024,"height":576,"mime-type":"image\/jpeg","filesize":472513,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20210007\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-1-1024x576.jpg"},"post-thumbnail":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-1-150x84.jpg","width":150,"height":84,"mime-type":"image\/jpeg","filesize":17482,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20210007\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-1-150x84.jpg"},"modern-property-child-slider":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-1-680x510.jpg","width":680,"height":510,"mime-type":"image\/jpeg","filesize":295447,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20210007\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-1-680x510.jpg"},"property-thumb-image":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-1-488x326.jpg","width":488,"height":326,"mime-type":"image\/jpeg","filesize":156913,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20210007\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-1-488x326.jpg"},"property-detail-video-image":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-1-818x417.jpg","width":818,"height":417,"mime-type":"image\/jpeg","filesize":306079,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20210007\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-1-818x417.jpg"},"agent-image":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-1-210x210.jpg","width":210,"height":210,"mime-type":"image\/jpeg","filesize":50146,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20210007\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-1-210x210.jpg"},"partners-logo":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-1-600x581.jpg","width":600,"height":581,"mime-type":"image\/jpeg","filesize":246886,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20210007\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-1-600x581.jpg"}},"image_meta":{"aperture":"0","credit":"","camera":"","caption":"","created_timestamp":"1490378221","copyright":"","focal_length":"0","iso":"0","shutter_speed":"0","title":"","orientation":"1","keywords":[]},"ID":"120821","name":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-1.jpg","path":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20210007\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-1.jpg","url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20210007\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-1-150x150.jpg","full_url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20210007\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-1.jpg","title":"GENERATION TOWER PRECONSTRUCTION PROJECT COSTA DEL ESTE PANAMA (1)","caption":"","description":"","alt":"Image of the outside of the Generation Tower building","srcset":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20210007\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-1-150x150.jpg 150w, https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20210007\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-1-210x210.jpg 210w"},{"width":150,"height":150,"file":"2023\/10\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-6.jpg","filesize":104405,"sizes":{"medium":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-6-300x161.jpg","width":300,"height":161,"mime-type":"image\/jpeg","filesize":47783,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20210004\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-6-300x161.jpg"},"large":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-6-1024x548.jpg","width":1024,"height":548,"mime-type":"image\/jpeg","filesize":363956,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20210004\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-6-1024x548.jpg"},"thumbnail":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-6-150x150.jpg","width":150,"height":150,"mime-type":"image\/jpeg","filesize":22603,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20210004\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-6-150x150.jpg"},"medium_large":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-6-768x411.jpg","width":768,"height":411,"mime-type":"image\/jpeg","filesize":233935,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20210004\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-6-768x411.jpg"},"post-thumbnail":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-6-150x80.jpg","width":150,"height":80,"mime-type":"image\/jpeg","filesize":14002,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20210004\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-6-150x80.jpg"},"modern-property-child-slider":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-6-680x510.jpg","width":680,"height":510,"mime-type":"image\/jpeg","filesize":231146,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20210004\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-6-680x510.jpg"},"property-thumb-image":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-6-488x326.jpg","width":488,"height":326,"mime-type":"image\/jpeg","filesize":127615,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20210004\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-6-488x326.jpg"},"property-detail-video-image":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-6-818x417.jpg","width":818,"height":417,"mime-type":"image\/jpeg","filesize":249864,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20210004\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-6-818x417.jpg"},"agent-image":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-6-210x210.jpg","width":210,"height":210,"mime-type":"image\/jpeg","filesize":40602,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20210004\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-6-210x210.jpg"},"partners-logo":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-6-600x553.jpg","width":600,"height":553,"mime-type":"image\/jpeg","filesize":169258,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20210004\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-6-600x553.jpg"},"woocommerce_thumbnail":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-6-300x300.jpg","width":300,"height":300,"mime-type":"image\/jpeg","filesize":72393,"uncropped":false,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20210004\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-6-300x300.jpg"},"woocommerce_single":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-6-600x321.jpg","width":600,"height":321,"mime-type":"image\/jpeg","filesize":155173,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20210004\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-6-600x321.jpg"},"woocommerce_gallery_thumbnail":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-6-100x100.jpg","width":100,"height":100,"mime-type":"image\/jpeg","filesize":11877,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20210004\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-6-100x100.jpg"}},"image_meta":{"aperture":"0","credit":"","camera":"","caption":"","created_timestamp":"1490034953","copyright":"","focal_length":"0","iso":"0","shutter_speed":"0","title":"","orientation":"1","keywords":[]},"ID":"120825","name":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-6.jpg","path":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20210004\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-6.jpg","url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20210004\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-6-150x150.jpg","full_url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20210004\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-6.jpg","title":"GENERATION TOWER PRECONSTRUCTION PROJECT COSTA DEL ESTE PANAMA (6)","caption":"","description":"","alt":"Image of the social area with a pool table and couches at Generation Tower","srcset":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20210004\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-6-150x150.jpg 150w, https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20210004\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-6-210x210.jpg 210w, https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20210004\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-6-300x300.jpg 300w, https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20210004\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-6-100x100.jpg 100w"},{"width":150,"height":150,"file":"2023\/10\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-8.jpg","filesize":100520,"sizes":{"medium":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-8-300x169.jpg","width":300,"height":169,"mime-type":"image\/jpeg","filesize":49690,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20210001\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-8-300x169.jpg"},"large":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-8-1024x576.jpg","width":1024,"height":576,"mime-type":"image\/jpeg","filesize":354411,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20210001\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-8-1024x576.jpg"},"thumbnail":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-8-150x150.jpg","width":150,"height":150,"mime-type":"image\/jpeg","filesize":22151,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20210001\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-8-150x150.jpg"},"medium_large":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-8-768x432.jpg","width":768,"height":432,"mime-type":"image\/jpeg","filesize":228054,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20210001\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-8-768x432.jpg"},"post-thumbnail":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-8-150x84.jpg","width":150,"height":84,"mime-type":"image\/jpeg","filesize":15396,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20210001\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-8-150x84.jpg"},"modern-property-child-slider":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-8-680x510.jpg","width":680,"height":510,"mime-type":"image\/jpeg","filesize":214385,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20210001\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-8-680x510.jpg"},"property-thumb-image":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-8-488x326.jpg","width":488,"height":326,"mime-type":"image\/jpeg","filesize":119846,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20210001\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-8-488x326.jpg"},"property-detail-video-image":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-8-818x417.jpg","width":818,"height":417,"mime-type":"image\/jpeg","filesize":226139,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20210001\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-8-818x417.jpg"},"agent-image":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-8-210x210.jpg","width":210,"height":210,"mime-type":"image\/jpeg","filesize":38319,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20210001\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-8-210x210.jpg"},"partners-logo":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-8-600x581.jpg","width":600,"height":581,"mime-type":"image\/jpeg","filesize":161824,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20210001\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-8-600x581.jpg"},"woocommerce_thumbnail":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-8-300x300.jpg","width":300,"height":300,"mime-type":"image\/jpeg","filesize":67896,"uncropped":false,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20210001\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-8-300x300.jpg"},"woocommerce_single":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-8-600x337.jpg","width":600,"height":337,"mime-type":"image\/jpeg","filesize":154809,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20210001\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-8-600x337.jpg"},"woocommerce_gallery_thumbnail":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-8-100x100.jpg","width":100,"height":100,"mime-type":"image\/jpeg","filesize":11710,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20210001\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-8-100x100.jpg"}},"image_meta":{"aperture":"0","credit":"","camera":"","caption":"","created_timestamp":"1490131875","copyright":"","focal_length":"0","iso":"0","shutter_speed":"0","title":"","orientation":"1","keywords":[]},"ID":"120829","name":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-8.jpg","path":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20210001\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-8.jpg","url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20210001\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-8-150x150.jpg","full_url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20210001\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-8.jpg","title":"GENERATION TOWER PRECONSTRUCTION PROJECT COSTA DEL ESTE PANAMA (8)","caption":"","description":"","alt":"Image of the pool area with deck chairs at Generation Tower","srcset":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20210001\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-8-150x150.jpg 150w, https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20210001\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-8-210x210.jpg 210w, https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20210001\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-8-300x300.jpg 300w, https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20210001\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-8-100x100.jpg 100w"},{"width":150,"height":150,"file":"2023\/10\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-11.jpg","filesize":110547,"sizes":{"medium":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-11-300x169.jpg","width":300,"height":169,"mime-type":"image\/jpeg","filesize":50856,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205956\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-11-300x169.jpg"},"large":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-11-1024x576.jpg","width":1024,"height":576,"mime-type":"image\/jpeg","filesize":394811,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205956\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-11-1024x576.jpg"},"thumbnail":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-11-150x150.jpg","width":150,"height":150,"mime-type":"image\/jpeg","filesize":23362,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205956\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-11-150x150.jpg"},"medium_large":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-11-768x432.jpg","width":768,"height":432,"mime-type":"image\/jpeg","filesize":250743,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205956\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-11-768x432.jpg"},"post-thumbnail":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-11-150x84.jpg","width":150,"height":84,"mime-type":"image\/jpeg","filesize":15379,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205956\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-11-150x84.jpg"},"modern-property-child-slider":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-11-680x510.jpg","width":680,"height":510,"mime-type":"image\/jpeg","filesize":246523,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205956\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-11-680x510.jpg"},"property-thumb-image":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-11-488x326.jpg","width":488,"height":326,"mime-type":"image\/jpeg","filesize":133796,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205956\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-11-488x326.jpg"},"property-detail-video-image":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-11-818x417.jpg","width":818,"height":417,"mime-type":"image\/jpeg","filesize":261801,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205956\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-11-818x417.jpg"},"agent-image":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-11-210x210.jpg","width":210,"height":210,"mime-type":"image\/jpeg","filesize":42238,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205956\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-11-210x210.jpg"},"partners-logo":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-11-600x581.jpg","width":600,"height":581,"mime-type":"image\/jpeg","filesize":191345,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205956\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-11-600x581.jpg"},"woocommerce_thumbnail":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-11-300x300.jpg","width":300,"height":300,"mime-type":"image\/jpeg","filesize":76273,"uncropped":false,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205956\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-11-300x300.jpg"},"woocommerce_single":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-11-600x337.jpg","width":600,"height":337,"mime-type":"image\/jpeg","filesize":167424,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205956\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-11-600x337.jpg"},"woocommerce_gallery_thumbnail":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-11-100x100.jpg","width":100,"height":100,"mime-type":"image\/jpeg","filesize":11932,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205956\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-11-100x100.jpg"}},"image_meta":{"aperture":"0","credit":"","camera":"","caption":"","created_timestamp":"1490233123","copyright":"","focal_length":"0","iso":"0","shutter_speed":"0","title":"","orientation":"1","keywords":[]},"ID":"120835","name":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-11.jpg","path":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205956\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-11.jpg","url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205956\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-11-150x150.jpg","full_url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205956\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-11.jpg","title":"GENERATION TOWER PRECONSTRUCTION PROJECT COSTA DEL ESTE PANAMA (11)","caption":"","description":"","alt":"Image of the swimming pool at Generation Tower Costa del Este","srcset":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205956\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-11-150x150.jpg 150w, https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205956\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-11-210x210.jpg 210w, https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205956\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-11-300x300.jpg 300w, https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205956\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-11-100x100.jpg 100w"},{"width":150,"height":150,"file":"2023\/10\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-12.jpg","filesize":89291,"sizes":{"medium":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-12-300x169.jpg","width":300,"height":169,"mime-type":"image\/jpeg","filesize":43865,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205955\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-12-300x169.jpg"},"large":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-12-1024x576.jpg","width":1024,"height":576,"mime-type":"image\/jpeg","filesize":326039,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205955\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-12-1024x576.jpg"},"thumbnail":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-12-150x150.jpg","width":150,"height":150,"mime-type":"image\/jpeg","filesize":21567,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205955\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-12-150x150.jpg"},"medium_large":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-12-768x432.jpg","width":768,"height":432,"mime-type":"image\/jpeg","filesize":209367,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205955\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-12-768x432.jpg"},"post-thumbnail":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-12-150x84.jpg","width":150,"height":84,"mime-type":"image\/jpeg","filesize":13604,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205955\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-12-150x84.jpg"},"modern-property-child-slider":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-12-680x510.jpg","width":680,"height":510,"mime-type":"image\/jpeg","filesize":205412,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205955\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-12-680x510.jpg"},"property-thumb-image":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-12-488x326.jpg","width":488,"height":326,"mime-type":"image\/jpeg","filesize":111827,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205955\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-12-488x326.jpg"},"property-detail-video-image":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-12-818x417.jpg","width":818,"height":417,"mime-type":"image\/jpeg","filesize":214487,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205955\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-12-818x417.jpg"},"agent-image":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-12-210x210.jpg","width":210,"height":210,"mime-type":"image\/jpeg","filesize":39039,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205955\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-12-210x210.jpg"},"partners-logo":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-12-600x581.jpg","width":600,"height":581,"mime-type":"image\/jpeg","filesize":165699,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205955\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-12-600x581.jpg"},"woocommerce_thumbnail":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-12-300x300.jpg","width":300,"height":300,"mime-type":"image\/jpeg","filesize":70362,"uncropped":false,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205955\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-12-300x300.jpg"},"woocommerce_single":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-12-600x337.jpg","width":600,"height":337,"mime-type":"image\/jpeg","filesize":141249,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205955\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-12-600x337.jpg"},"woocommerce_gallery_thumbnail":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-12-100x100.jpg","width":100,"height":100,"mime-type":"image\/jpeg","filesize":11140,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205955\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-12-100x100.jpg"}},"image_meta":{"aperture":"0","credit":"","camera":"","caption":"","created_timestamp":"1490227388","copyright":"","focal_length":"0","iso":"0","shutter_speed":"0","title":"","orientation":"1","keywords":[]},"ID":"120837","name":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-12.jpg","path":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205955\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-12.jpg","url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205955\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-12-150x150.jpg","full_url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205955\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-12.jpg","title":"GENERATION TOWER PRECONSTRUCTION PROJECT COSTA DEL ESTE PANAMA (12)","caption":"","description":"","alt":"Image of the pool area with partial view of the pool and multiple seating at Generation Tower","srcset":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205955\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-12-150x150.jpg 150w, https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205955\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-12-210x210.jpg 210w, https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205955\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-12-300x300.jpg 300w, https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205955\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-12-100x100.jpg 100w"},{"width":150,"height":150,"file":"2023\/10\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-17.jpg","filesize":110742,"sizes":{"medium":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-17-300x169.jpg","width":300,"height":169,"mime-type":"image\/jpeg","filesize":47612,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205952\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-17-300x169.jpg"},"large":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-17-1024x576.jpg","width":1024,"height":576,"mime-type":"image\/jpeg","filesize":368990,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205952\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-17-1024x576.jpg"},"thumbnail":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-17-150x150.jpg","width":150,"height":150,"mime-type":"image\/jpeg","filesize":23026,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205952\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-17-150x150.jpg"},"medium_large":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-17-768x432.jpg","width":768,"height":432,"mime-type":"image\/jpeg","filesize":234197,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205952\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-17-768x432.jpg"},"post-thumbnail":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-17-150x84.jpg","width":150,"height":84,"mime-type":"image\/jpeg","filesize":14796,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205952\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-17-150x84.jpg"},"modern-property-child-slider":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-17-680x510.jpg","width":680,"height":510,"mime-type":"image\/jpeg","filesize":236570,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205952\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-17-680x510.jpg"},"property-thumb-image":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-17-488x326.jpg","width":488,"height":326,"mime-type":"image\/jpeg","filesize":124523,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205952\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-17-488x326.jpg"},"property-detail-video-image":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-17-818x417.jpg","width":818,"height":417,"mime-type":"image\/jpeg","filesize":243205,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205952\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-17-818x417.jpg"},"agent-image":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-17-210x210.jpg","width":210,"height":210,"mime-type":"image\/jpeg","filesize":40784,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205952\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-17-210x210.jpg"},"partners-logo":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-17-600x581.jpg","width":600,"height":581,"mime-type":"image\/jpeg","filesize":193453,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205952\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-17-600x581.jpg"},"woocommerce_thumbnail":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-17-300x300.jpg","width":300,"height":300,"mime-type":"image\/jpeg","filesize":74476,"uncropped":false,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205952\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-17-300x300.jpg"},"woocommerce_single":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-17-600x337.jpg","width":600,"height":337,"mime-type":"image\/jpeg","filesize":155306,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205952\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-17-600x337.jpg"},"woocommerce_gallery_thumbnail":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-17-100x100.jpg","width":100,"height":100,"mime-type":"image\/jpeg","filesize":11744,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205952\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-17-100x100.jpg"}},"image_meta":{"aperture":"0","credit":"","camera":"","caption":"","created_timestamp":"1490612512","copyright":"","focal_length":"0","iso":"0","shutter_speed":"0","title":"","orientation":"1","keywords":[]},"ID":"120841","name":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-17.jpg","path":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205952\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-17.jpg","url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205952\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-17-150x150.jpg","full_url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205952\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-17.jpg","title":"GENERATION TOWER PRECONSTRUCTION PROJECT COSTA DEL ESTE PANAMA (17)","caption":"","description":"","alt":"Image of the co working space with a table and multiple chairs at Generation Tower","srcset":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205952\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-17-150x150.jpg 150w, https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205952\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-17-210x210.jpg 210w, https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205952\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-17-300x300.jpg 300w, https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205952\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-17-100x100.jpg 100w"},{"width":150,"height":150,"file":"2023\/10\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-18.jpg","filesize":593935,"sizes":{"medium":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-18-300x200.jpg","width":300,"height":200,"mime-type":"image\/jpeg","filesize":52755,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205950\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-18-300x200.jpg"},"large":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-18-1024x683.jpg","width":1024,"height":683,"mime-type":"image\/jpeg","filesize":467093,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205950\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-18-1024x683.jpg"},"thumbnail":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-18-150x150.jpg","width":150,"height":150,"mime-type":"image\/jpeg","filesize":21427,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205950\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-18-150x150.jpg"},"medium_large":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-18-768x512.jpg","width":768,"height":512,"mime-type":"image\/jpeg","filesize":281625,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205950\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-18-768x512.jpg"},"post-thumbnail":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-18-150x100.jpg","width":150,"height":100,"mime-type":"image\/jpeg","filesize":16169,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205950\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-18-150x100.jpg"},"modern-property-child-slider":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-18-680x510.jpg","width":680,"height":510,"mime-type":"image\/jpeg","filesize":247697,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205950\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-18-680x510.jpg"},"property-thumb-image":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-18-488x326.jpg","width":488,"height":326,"mime-type":"image\/jpeg","filesize":125765,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205950\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-18-488x326.jpg"},"property-detail-video-image":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-18-818x417.jpg","width":818,"height":417,"mime-type":"image\/jpeg","filesize":258366,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205950\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-18-818x417.jpg"},"agent-image":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-18-210x210.jpg","width":210,"height":210,"mime-type":"image\/jpeg","filesize":38590,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205950\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-18-210x210.jpg"},"partners-logo":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-18-600x703.jpg","width":600,"height":703,"mime-type":"image\/jpeg","filesize":288107,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205950\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-18-600x703.jpg"},"woocommerce_thumbnail":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-18-300x300.jpg","width":300,"height":300,"mime-type":"image\/jpeg","filesize":70972,"uncropped":false,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205950\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-18-300x300.jpg"},"woocommerce_single":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-18-600x400.jpg","width":600,"height":400,"mime-type":"image\/jpeg","filesize":181273,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205950\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-18-600x400.jpg"},"woocommerce_gallery_thumbnail":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-18-100x100.jpg","width":100,"height":100,"mime-type":"image\/jpeg","filesize":11263,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205950\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-18-100x100.jpg"}},"image_meta":{"aperture":"0","credit":"Ramses.A","camera":"Canon EOS RP","caption":"","created_timestamp":"1678244914","copyright":"","focal_length":"0","iso":"100","shutter_speed":"0","title":"","orientation":"0","keywords":[]},"ID":"120843","name":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-18.jpg","path":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205950\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-18.jpg","url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205950\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-18-150x150.jpg","full_url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205950\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-18.jpg","title":"GENERATION TOWER PRECONSTRUCTION PROJECT COSTA DEL ESTE PANAMA (18)","caption":"","description":"","alt":"Image of the living area with a table and chairs at Generation Tower","srcset":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205950\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-18-150x150.jpg 150w, https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205950\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-18-210x210.jpg 210w, https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205950\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-18-300x300.jpg 300w, https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205950\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-18-100x100.jpg 100w"},{"width":150,"height":150,"file":"2023\/10\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-19.jpg","filesize":475913,"sizes":{"medium":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-19-300x200.jpg","width":300,"height":200,"mime-type":"image\/jpeg","filesize":46338,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205949\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-19-300x200.jpg"},"large":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-19-1024x683.jpg","width":1024,"height":683,"mime-type":"image\/jpeg","filesize":398584,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205949\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-19-1024x683.jpg"},"thumbnail":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-19-150x150.jpg","width":150,"height":150,"mime-type":"image\/jpeg","filesize":20452,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205949\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-19-150x150.jpg"},"medium_large":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-19-768x512.jpg","width":768,"height":512,"mime-type":"image\/jpeg","filesize":240282,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205949\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-19-768x512.jpg"},"post-thumbnail":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-19-150x100.jpg","width":150,"height":100,"mime-type":"image\/jpeg","filesize":15060,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205949\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-19-150x100.jpg"},"modern-property-child-slider":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-19-680x510.jpg","width":680,"height":510,"mime-type":"image\/jpeg","filesize":215903,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205949\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-19-680x510.jpg"},"property-thumb-image":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-19-488x326.jpg","width":488,"height":326,"mime-type":"image\/jpeg","filesize":108885,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205949\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-19-488x326.jpg"},"property-detail-video-image":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-19-818x417.jpg","width":818,"height":417,"mime-type":"image\/jpeg","filesize":215339,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205949\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-19-818x417.jpg"},"agent-image":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-19-210x210.jpg","width":210,"height":210,"mime-type":"image\/jpeg","filesize":35631,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205949\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-19-210x210.jpg"},"partners-logo":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-19-600x703.jpg","width":600,"height":703,"mime-type":"image\/jpeg","filesize":269452,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205949\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-19-600x703.jpg"},"woocommerce_thumbnail":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-19-300x300.jpg","width":300,"height":300,"mime-type":"image\/jpeg","filesize":64949,"uncropped":false,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205949\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-19-300x300.jpg"},"woocommerce_single":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-19-600x400.jpg","width":600,"height":400,"mime-type":"image\/jpeg","filesize":154700,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205949\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-19-600x400.jpg"},"woocommerce_gallery_thumbnail":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-19-100x100.jpg","width":100,"height":100,"mime-type":"image\/jpeg","filesize":10756,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205949\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-19-100x100.jpg"}},"image_meta":{"aperture":"0","credit":"Ramses.A","camera":"Canon EOS RP","caption":"","created_timestamp":"1678244939","copyright":"","focal_length":"0","iso":"100","shutter_speed":"0","title":"","orientation":"0","keywords":[]},"ID":"120845","name":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-19.jpg","path":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205949\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-19.jpg","url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205949\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-19-150x150.jpg","full_url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205949\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-19.jpg","title":"GENERATION TOWER PRECONSTRUCTION PROJECT COSTA DEL ESTE PANAMA (19)","caption":"","description":"","alt":"Image of dining area with a table and chairs and cabinetry at Generation Tower","srcset":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205949\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-19-150x150.jpg 150w, https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205949\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-19-210x210.jpg 210w, https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205949\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-19-300x300.jpg 300w, https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205949\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-19-100x100.jpg 100w"},{"width":150,"height":150,"file":"2023\/10\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-21.jpg","filesize":562907,"sizes":{"medium":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-21-300x200.jpg","width":300,"height":200,"mime-type":"image\/jpeg","filesize":51955,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205946\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-21-300x200.jpg"},"large":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-21-1024x683.jpg","width":1024,"height":683,"mime-type":"image\/jpeg","filesize":447559,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205946\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-21-1024x683.jpg"},"thumbnail":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-21-150x150.jpg","width":150,"height":150,"mime-type":"image\/jpeg","filesize":22346,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205946\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-21-150x150.jpg"},"medium_large":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-21-768x512.jpg","width":768,"height":512,"mime-type":"image\/jpeg","filesize":269476,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205946\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-21-768x512.jpg"},"post-thumbnail":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-21-150x100.jpg","width":150,"height":100,"mime-type":"image\/jpeg","filesize":16855,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205946\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-21-150x100.jpg"},"modern-property-child-slider":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-21-680x510.jpg","width":680,"height":510,"mime-type":"image\/jpeg","filesize":241216,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205946\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-21-680x510.jpg"},"property-thumb-image":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-21-488x326.jpg","width":488,"height":326,"mime-type":"image\/jpeg","filesize":121303,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205946\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-21-488x326.jpg"},"property-detail-video-image":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-21-818x417.jpg","width":818,"height":417,"mime-type":"image\/jpeg","filesize":243184,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205946\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-21-818x417.jpg"},"agent-image":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-21-210x210.jpg","width":210,"height":210,"mime-type":"image\/jpeg","filesize":39565,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205946\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-21-210x210.jpg"},"partners-logo":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-21-600x703.jpg","width":600,"height":703,"mime-type":"image\/jpeg","filesize":291113,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205946\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-21-600x703.jpg"},"woocommerce_thumbnail":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-21-300x300.jpg","width":300,"height":300,"mime-type":"image\/jpeg","filesize":71430,"uncropped":false,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205946\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-21-300x300.jpg"},"woocommerce_single":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-21-600x400.jpg","width":600,"height":400,"mime-type":"image\/jpeg","filesize":173665,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205946\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-21-600x400.jpg"},"woocommerce_gallery_thumbnail":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-21-100x100.jpg","width":100,"height":100,"mime-type":"image\/jpeg","filesize":11848,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205946\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-21-100x100.jpg"}},"image_meta":{"aperture":"0","credit":"Ramses.A","camera":"Canon EOS RP","caption":"","created_timestamp":"1678244978","copyright":"","focal_length":"0","iso":"100","shutter_speed":"0","title":"","orientation":"0","keywords":[]},"ID":"120849","name":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-21.jpg","path":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205946\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-21.jpg","url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205946\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-21-150x150.jpg","full_url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205946\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-21.jpg","title":"GENERATION TOWER PRECONSTRUCTION PROJECT COSTA DEL ESTE PANAMA (21)","caption":"","description":"","alt":"Image of the kitchen andliving area at Generation Tower with a table and chairs at Generation Tower","srcset":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205946\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-21-150x150.jpg 150w, https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205946\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-21-210x210.jpg 210w, https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205946\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-21-300x300.jpg 300w, https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205946\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-21-100x100.jpg 100w"},{"width":150,"height":150,"file":"2023\/10\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-22.jpg","filesize":699599,"sizes":{"medium":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-22-300x200.jpg","width":300,"height":200,"mime-type":"image\/jpeg","filesize":56026,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205945\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-22-300x200.jpg"},"large":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-22-1024x683.jpg","width":1024,"height":683,"mime-type":"image\/jpeg","filesize":525418,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205945\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-22-1024x683.jpg"},"thumbnail":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-22-150x150.jpg","width":150,"height":150,"mime-type":"image\/jpeg","filesize":22326,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205945\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-22-150x150.jpg"},"medium_large":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-22-768x512.jpg","width":768,"height":512,"mime-type":"image\/jpeg","filesize":312912,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205945\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-22-768x512.jpg"},"post-thumbnail":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-22-150x100.jpg","width":150,"height":100,"mime-type":"image\/jpeg","filesize":16635,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205945\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-22-150x100.jpg"},"modern-property-child-slider":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-22-680x510.jpg","width":680,"height":510,"mime-type":"image\/jpeg","filesize":275864,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205945\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-22-680x510.jpg"},"property-thumb-image":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-22-488x326.jpg","width":488,"height":326,"mime-type":"image\/jpeg","filesize":137140,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205945\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-22-488x326.jpg"},"property-detail-video-image":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-22-818x417.jpg","width":818,"height":417,"mime-type":"image\/jpeg","filesize":291719,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205945\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-22-818x417.jpg"},"agent-image":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-22-210x210.jpg","width":210,"height":210,"mime-type":"image\/jpeg","filesize":41606,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205945\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-22-210x210.jpg"},"partners-logo":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-22-600x703.jpg","width":600,"height":703,"mime-type":"image\/jpeg","filesize":356321,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205945\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-22-600x703.jpg"},"woocommerce_thumbnail":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-22-300x300.jpg","width":300,"height":300,"mime-type":"image\/jpeg","filesize":79012,"uncropped":false,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205945\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-22-300x300.jpg"},"woocommerce_single":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-22-600x400.jpg","width":600,"height":400,"mime-type":"image\/jpeg","filesize":199641,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205945\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-22-600x400.jpg"},"woocommerce_gallery_thumbnail":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-22-100x100.jpg","width":100,"height":100,"mime-type":"image\/jpeg","filesize":11307,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205945\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-22-100x100.jpg"}},"image_meta":{"aperture":"0","credit":"Ramses.A","camera":"Canon EOS RP","caption":"","created_timestamp":"1678245017","copyright":"","focal_length":"0","iso":"100","shutter_speed":"0","title":"","orientation":"0","keywords":[]},"ID":"120851","name":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-22.jpg","path":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205945\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-22.jpg","url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205945\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-22-150x150.jpg","full_url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205945\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-22.jpg","title":"GENERATION TOWER PRECONSTRUCTION PROJECT COSTA DEL ESTE PANAMA (22)","caption":"","description":"","alt":"Image of a couch, small table and two chairs at Generation Tower","srcset":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205945\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-22-150x150.jpg 150w, https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205945\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-22-210x210.jpg 210w, https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205945\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-22-300x300.jpg 300w, https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205945\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-22-100x100.jpg 100w"},{"width":150,"height":150,"file":"2023\/10\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-23.jpg","filesize":466743,"sizes":{"medium":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-23-300x200.jpg","width":300,"height":200,"mime-type":"image\/jpeg","filesize":43332,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205944\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-23-300x200.jpg"},"large":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-23-1024x683.jpg","width":1024,"height":683,"mime-type":"image\/jpeg","filesize":391731,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205944\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-23-1024x683.jpg"},"thumbnail":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-23-150x150.jpg","width":150,"height":150,"mime-type":"image\/jpeg","filesize":19102,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205944\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-23-150x150.jpg"},"medium_large":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-23-768x512.jpg","width":768,"height":512,"mime-type":"image\/jpeg","filesize":231519,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205944\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-23-768x512.jpg"},"post-thumbnail":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-23-150x100.jpg","width":150,"height":100,"mime-type":"image\/jpeg","filesize":13834,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205944\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-23-150x100.jpg"},"modern-property-child-slider":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-23-680x510.jpg","width":680,"height":510,"mime-type":"image\/jpeg","filesize":208406,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205944\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-23-680x510.jpg"},"property-thumb-image":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-23-488x326.jpg","width":488,"height":326,"mime-type":"image\/jpeg","filesize":102557,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205944\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-23-488x326.jpg"},"property-detail-video-image":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-23-818x417.jpg","width":818,"height":417,"mime-type":"image\/jpeg","filesize":207876,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205944\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-23-818x417.jpg"},"agent-image":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-23-210x210.jpg","width":210,"height":210,"mime-type":"image\/jpeg","filesize":33661,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205944\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-23-210x210.jpg"},"partners-logo":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-23-600x703.jpg","width":600,"height":703,"mime-type":"image\/jpeg","filesize":259767,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205944\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-23-600x703.jpg"},"woocommerce_thumbnail":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-23-300x300.jpg","width":300,"height":300,"mime-type":"image\/jpeg","filesize":62058,"uncropped":false,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205944\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-23-300x300.jpg"},"woocommerce_single":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-23-600x400.jpg","width":600,"height":400,"mime-type":"image\/jpeg","filesize":148027,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205944\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-23-600x400.jpg"},"woocommerce_gallery_thumbnail":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-23-100x100.jpg","width":100,"height":100,"mime-type":"image\/jpeg","filesize":10152,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205944\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-23-100x100.jpg"}},"image_meta":{"aperture":"0","credit":"Ramses.A","camera":"Canon EOS RP","caption":"","created_timestamp":"1678245049","copyright":"","focal_length":"0","iso":"100","shutter_speed":"0","title":"","orientation":"0","keywords":[]},"ID":"120853","name":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-23.jpg","path":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205944\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-23.jpg","url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205944\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-23-150x150.jpg","full_url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205944\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-23.jpg","title":"GENERATION TOWER PRECONSTRUCTION PROJECT COSTA DEL ESTE PANAMA (23)","caption":"","description":"","alt":"Image of the living area with a table and chairs at Generation Tower","srcset":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205944\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-23-150x150.jpg 150w, https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205944\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-23-210x210.jpg 210w, https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205944\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-23-300x300.jpg 300w, https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205944\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-23-100x100.jpg 100w"},{"width":150,"height":150,"file":"2023\/10\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-25.jpg","filesize":565540,"sizes":{"medium":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-25-300x200.jpg","width":300,"height":200,"mime-type":"image\/jpeg","filesize":49773,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205941\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-25-300x200.jpg"},"large":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-25-1024x683.jpg","width":1024,"height":683,"mime-type":"image\/jpeg","filesize":450761,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205941\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-25-1024x683.jpg"},"thumbnail":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-25-150x150.jpg","width":150,"height":150,"mime-type":"image\/jpeg","filesize":21066,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205941\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-25-150x150.jpg"},"medium_large":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-25-768x512.jpg","width":768,"height":512,"mime-type":"image\/jpeg","filesize":269578,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205941\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-25-768x512.jpg"},"post-thumbnail":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-25-150x100.jpg","width":150,"height":100,"mime-type":"image\/jpeg","filesize":15336,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205941\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-25-150x100.jpg"},"modern-property-child-slider":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-25-680x510.jpg","width":680,"height":510,"mime-type":"image\/jpeg","filesize":244500,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205941\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-25-680x510.jpg"},"property-thumb-image":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-25-488x326.jpg","width":488,"height":326,"mime-type":"image\/jpeg","filesize":119618,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205941\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-25-488x326.jpg"},"property-detail-video-image":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-25-818x417.jpg","width":818,"height":417,"mime-type":"image\/jpeg","filesize":249268,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205941\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-25-818x417.jpg"},"agent-image":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-25-210x210.jpg","width":210,"height":210,"mime-type":"image\/jpeg","filesize":38251,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205941\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-25-210x210.jpg"},"partners-logo":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-25-600x703.jpg","width":600,"height":703,"mime-type":"image\/jpeg","filesize":306898,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205941\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-25-600x703.jpg"},"woocommerce_thumbnail":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-25-300x300.jpg","width":300,"height":300,"mime-type":"image\/jpeg","filesize":71782,"uncropped":false,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205941\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-25-300x300.jpg"},"woocommerce_single":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-25-600x400.jpg","width":600,"height":400,"mime-type":"image\/jpeg","filesize":172707,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205941\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-25-600x400.jpg"},"woocommerce_gallery_thumbnail":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-25-100x100.jpg","width":100,"height":100,"mime-type":"image\/jpeg","filesize":10929,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205941\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-25-100x100.jpg"}},"image_meta":{"aperture":"0","credit":"Ramses.A","camera":"Canon EOS RP","caption":"","created_timestamp":"1678245086","copyright":"","focal_length":"0","iso":"100","shutter_speed":"0","title":"","orientation":"0","keywords":[]},"ID":"120857","name":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-25.jpg","path":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205941\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-25.jpg","url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205941\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-25-150x150.jpg","full_url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205941\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-25.jpg","title":"GENERATION TOWER PRECONSTRUCTION PROJECT COSTA DEL ESTE PANAMA (25)","caption":"","description":"","alt":"Image of bedroom with bed and window looking out onto the social area at Generation Tower","srcset":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205941\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-25-150x150.jpg 150w, https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205941\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-25-210x210.jpg 210w, https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205941\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-25-300x300.jpg 300w, https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205941\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-25-100x100.jpg 100w"},{"width":150,"height":150,"file":"2023\/10\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-27.jpg","filesize":380420,"sizes":{"medium":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-27-300x200.jpg","width":300,"height":200,"mime-type":"image\/jpeg","filesize":36059,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205938\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-27-300x200.jpg"},"large":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-27-1024x683.jpg","width":1024,"height":683,"mime-type":"image\/jpeg","filesize":340615,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205938\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-27-1024x683.jpg"},"thumbnail":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-27-150x150.jpg","width":150,"height":150,"mime-type":"image\/jpeg","filesize":15047,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205938\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-27-150x150.jpg"},"medium_large":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-27-768x512.jpg","width":768,"height":512,"mime-type":"image\/jpeg","filesize":200889,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205938\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-27-768x512.jpg"},"post-thumbnail":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-27-150x100.jpg","width":150,"height":100,"mime-type":"image\/jpeg","filesize":11531,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205938\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-27-150x100.jpg"},"modern-property-child-slider":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-27-680x510.jpg","width":680,"height":510,"mime-type":"image\/jpeg","filesize":172423,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205938\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-27-680x510.jpg"},"property-thumb-image":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-27-488x326.jpg","width":488,"height":326,"mime-type":"image\/jpeg","filesize":87500,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205938\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-27-488x326.jpg"},"property-detail-video-image":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-27-818x417.jpg","width":818,"height":417,"mime-type":"image\/jpeg","filesize":178689,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205938\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-27-818x417.jpg"},"agent-image":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-27-210x210.jpg","width":210,"height":210,"mime-type":"image\/jpeg","filesize":26865,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205938\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-27-210x210.jpg"},"partners-logo":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-27-600x703.jpg","width":600,"height":703,"mime-type":"image\/jpeg","filesize":217619,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205938\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-27-600x703.jpg"},"woocommerce_thumbnail":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-27-300x300.jpg","width":300,"height":300,"mime-type":"image\/jpeg","filesize":49727,"uncropped":false,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205938\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-27-300x300.jpg"},"woocommerce_single":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-27-600x400.jpg","width":600,"height":400,"mime-type":"image\/jpeg","filesize":127066,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205938\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-27-600x400.jpg"},"woocommerce_gallery_thumbnail":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-27-100x100.jpg","width":100,"height":100,"mime-type":"image\/jpeg","filesize":8017,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205938\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-27-100x100.jpg"}},"image_meta":{"aperture":"0","credit":"Ramses.A","camera":"Canon EOS RP","caption":"","created_timestamp":"1678245199","copyright":"","focal_length":"0","iso":"100","shutter_speed":"0","title":"","orientation":"0","keywords":[]},"ID":"120861","name":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-27.jpg","path":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205938\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-27.jpg","url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205938\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-27-150x150.jpg","full_url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205938\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-27.jpg","title":"GENERATION TOWER PRECONSTRUCTION PROJECT COSTA DEL ESTE PANAMA (27)","caption":"","description":"","alt":"Image of bathroom with sink, toilet, and mirror at Generation Tower","srcset":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205938\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-27-150x150.jpg 150w, https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205938\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-27-210x210.jpg 210w, https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205938\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-27-300x300.jpg 300w, https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205938\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-27-100x100.jpg 100w"},{"width":150,"height":150,"file":"2023\/10\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-28.jpg","filesize":499225,"sizes":{"medium":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-28-300x200.jpg","width":300,"height":200,"mime-type":"image\/jpeg","filesize":39177,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205937\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-28-300x200.jpg"},"large":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-28-1024x683.jpg","width":1024,"height":683,"mime-type":"image\/jpeg","filesize":409639,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205937\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-28-1024x683.jpg"},"thumbnail":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-28-150x150.jpg","width":150,"height":150,"mime-type":"image\/jpeg","filesize":16473,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205937\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-28-150x150.jpg"},"medium_large":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-28-768x512.jpg","width":768,"height":512,"mime-type":"image\/jpeg","filesize":239119,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205937\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-28-768x512.jpg"},"post-thumbnail":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-28-150x100.jpg","width":150,"height":100,"mime-type":"image\/jpeg","filesize":11278,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205937\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-28-150x100.jpg"},"modern-property-child-slider":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-28-680x510.jpg","width":680,"height":510,"mime-type":"image\/jpeg","filesize":220001,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205937\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-28-680x510.jpg"},"property-thumb-image":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-28-488x326.jpg","width":488,"height":326,"mime-type":"image\/jpeg","filesize":100661,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205937\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-28-488x326.jpg"},"property-detail-video-image":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-28-818x417.jpg","width":818,"height":417,"mime-type":"image\/jpeg","filesize":210096,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205937\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-28-818x417.jpg"},"agent-image":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-28-210x210.jpg","width":210,"height":210,"mime-type":"image\/jpeg","filesize":31387,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205937\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-28-210x210.jpg"},"partners-logo":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-28-600x703.jpg","width":600,"height":703,"mime-type":"image\/jpeg","filesize":310370,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205937\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-28-600x703.jpg"},"woocommerce_thumbnail":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-28-300x300.jpg","width":300,"height":300,"mime-type":"image\/jpeg","filesize":62191,"uncropped":false,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205937\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-28-300x300.jpg"},"woocommerce_single":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-28-600x400.jpg","width":600,"height":400,"mime-type":"image\/jpeg","filesize":148604,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205937\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-28-600x400.jpg"},"woocommerce_gallery_thumbnail":{"file":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-28-100x100.jpg","width":100,"height":100,"mime-type":"image\/jpeg","filesize":8173,"url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205937\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-28-100x100.jpg"}},"image_meta":{"aperture":"0","credit":"Ramses.A","camera":"Canon EOS RP","caption":"","created_timestamp":"1678245269","copyright":"","focal_length":"0","iso":"100","shutter_speed":"0","title":"","orientation":"0","keywords":[]},"ID":"120863","name":"GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-28.jpg","path":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205937\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-28.jpg","url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205937\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-28-150x150.jpg","full_url":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205937\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-28.jpg","title":"GENERATION TOWER PRECONSTRUCTION PROJECT COSTA DEL ESTE PANAMA (28)","caption":"","description":"","alt":"Image of bathroom with toilet and shower at Generation Tower","srcset":"https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205937\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-28-150x150.jpg 150w, https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205937\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-28-210x210.jpg 210w, https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205937\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-28-300x300.jpg 300w, https:\/\/panama-equity-media.s3.amazonaws.com\/wp-content\/uploads\/2023\/10\/20205937\/GENERATION-TOWER-PRECONSTRUCTION-PROJECT-COSTA-DEL-ESTE-PANAMA-28-100x100.jpg 100w"}],"REAL_HOMES_change_gallery_slider_type":"0","REAL_HOMES_gallery_slider_type":"thumb-on-right","inspiry_floor_plans":[],"inspiry_video_group":[],"REAL_HOMES_360_virtual_tour":"","REAL_HOMES_agent_display_option":"my_profile_info","REAL_HOMES_agents":[],"REAL_HOMES_energy_class":"none","REAL_HOMES_energy_performance":"","REAL_HOMES_epc_current_rating":"","REAL_HOMES_epc_potential_rating":"","ere_property_schedule_tour":"global","ere_property_schedule_time_slots":"","ere_property_schedule_description":"","REAL_HOMES_sticky":"0","inspiry_property_label":"","inspiry_property_label_color":"","inspiry_property_tax":"","inspiry_additional_fee":"","REAL_HOMES_attachments":[],"inspiry_property_owner_name":"","inspiry_property_owner_contact":"","inspiry_property_owner_address":"","REAL_HOMES_property_private_note":"","inspiry_message_to_reviewer":"","REAL_HOMES_add_in_slider":"","REAL_HOMES_slider_image":[],"REAL_HOMES_page_banner_image":[],"REAL_HOMES_hide_property_advance_search":"0","inspiry_furnished?":"YES","inspiry_finca_number":"NA","inspiry_ownership":"DEVELOPER","inspiry_exoneration_filed_until_year":"NA","inspiry_taxes_per_year":"NA","inspiry_registered_value":"NA","inspiry_contact_for_showing":"","inspiry_contact_name":"","inspiry_contact_phone_number":"","inspiry_do_we_have_the_keys?_":"","inspiry_mortgage":"","inspiry_cbe?":"","inspiry_guesthouse":"","inspiry_well_water":"","inspiry_electric_generator":"","inspiry_storage":"","inspiry_swimming_pool?":"","inspiry_amount_of_maintenance_fees?":"$4.5usd\/m2 Includes Condo Hotel License","inspiry_when_was_the_last_assessment":"NA","inspiry_price_includes":"Furniture and appliances","inspiry_reason_for_selling?":"DEVELOPER","inspiry_sales_commission":"4%","inspiry_septic_tank_last_cleaned?":"NA","inspiry_lead_source":"DEVELOPER","inspiry_pocket_listing?":"no","inspiry_seller_will_accept_crypto_currencies?":"no","inspiry_ca":"","inspiry_e24":"","inspiry_mls":"","inspiry__document_&_photo_link":"https:\/\/drive.google.com\/drive\/folders\/17V5CbnElSOhMHjv_mCFQysANiv41mXME?usp=drive_link","inspiry_name_of_the_building":"PH GENERATION","inspiry_owners_email":"smontano@empresasbern.com","inspiry_owners_phone":"+507 6675-2160","inspiry_apartment_number":"Price LIst","REAL_HOMES_custom_header_display":"default","REAL_HOMES_custom_header_position":"relative","REAL_HOMES_custom_footer_display":"default","REAL_HOMES_hide_advance_search":"0","REAL_HOMES_custom_search_form":"default","REAL_HOMES_search_form_margin_top":"","REAL_HOMES_search_form_margin_bottom":""},"publishpress_future_action":{"enabled":false,"date":"2026-06-24 05:20:45","action":"change-status","newStatus":"draft","terms":[],"taxonomy":"property-feature","extraData":[]},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.panamaequity.com\/es\/wp-json\/wp\/v2\/listings\/121044","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.panamaequity.com\/es\/wp-json\/wp\/v2\/listings"}],"about":[{"href":"https:\/\/www.panamaequity.com\/es\/wp-json\/wp\/v2\/types\/property"}],"author":[{"embeddable":true,"href":"https:\/\/www.panamaequity.com\/es\/wp-json\/wp\/v2\/users\/23323"}],"replies":[{"embeddable":true,"href":"https:\/\/www.panamaequity.com\/es\/wp-json\/wp\/v2\/comments?post=121044"}],"version-history":[{"count":0,"href":"https:\/\/www.panamaequity.com\/es\/wp-json\/wp\/v2\/listings\/121044\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.panamaequity.com\/es\/wp-json\/wp\/v2\/media\/120821"}],"wp:attachment":[{"href":"https:\/\/www.panamaequity.com\/es\/wp-json\/wp\/v2\/media?parent=121044"}],"wp:term":[{"taxonomy":"property-feature","embeddable":true,"href":"https:\/\/www.panamaequity.com\/es\/wp-json\/wp\/v2\/property-feature?post=121044"},{"taxonomy":"property-type","embeddable":true,"href":"https:\/\/www.panamaequity.com\/es\/wp-json\/wp\/v2\/property-type?post=121044"},{"taxonomy":"property-city","embeddable":true,"href":"https:\/\/www.panamaequity.com\/es\/wp-json\/wp\/v2\/property-city?post=121044"},{"taxonomy":"property-status","embeddable":true,"href":"https:\/\/www.panamaequity.com\/es\/wp-json\/wp\/v2\/property-status?post=121044"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}